.jpg)
Rapid Construction commences onsite – Jan 2011
|
.jpg)
Rod and Judith Cook tend their fruit trees and seedlings for planting out when the construction is finished
|
.jpg)
Beautiful soil dug out for the stormwater tank site
|
.jpg)
Super architect and contract superintendent JP solving some impossible problem!
|
.jpg)
Excavation for the stormwater tanks at the bottom of the site. Looks like JP wants a turn on the excavator! |
.jpg)
Under-boring to get the service pipes and cables past the two big spotted gum trees without damaging their roots – March 2011
|
.jpg)
Gas, water, electricity, sewer and telecoms services in place
|
.jpg)
Formwork for the roads take shape
|
.jpg)
Road 2 curving around the top of the hill
|
.jpg)
Washing the concrete to give the nice exposed aggregate finish |
.jpg)
Matt the digger man excavating the sewer line through the forest – April 2011 |
.jpg)
Eco-concrete road curving past the old Illabunda house |
.jpg)
Sue cleaning up the newly poured visitor’s carpark |
.jpg)
Pumping concrete for the roads outside of lots 4/5 and 16 – May 2011 |
|